A quiet servery before breakfast, tablet on the pass

Dietary · EVS · Plant Ops

How is today going?

See coverage, readiness, logs, and issues for this meal — from the manager’s board and the tablet on the floor.

See how a day runs

WorkspaceLunch · 11:40
What needs meDietary

2 West

Warmer down · Needs attention

South dining

One call-down · coverage short

3 East

Ready for lunch

A day on the floor

One picture of the meal — from open to handoff.

Before service, during service, when something breaks, and after. The same facts, wherever you are standing.

A commercial kitchen before service

6:10

Before service

Coverage

See who is on, who called down, and which locations are short — before the first tray goes out.

A tray line during lunch

7:02

During service

Ready

Each location shows whether it is ready, in progress, or needs attention. You do not assemble the picture from the radio.

A technician working on an empty kitchen warmer

10:40

When something breaks

Issues

A warmer goes down. The issue lives on that location, with a next step — not in a text thread.

A dining room being reset after the meal

2:15

After

Already recorded

Logs and handoffs are attached to the work that just happened. Survey time is not a scavenger hunt.

The product

Three places to stand. One picture of the day.

What needs meDietary

2 West

Warmer down · Needs attention

South dining

One call-down · coverage short

3 East

Ready for lunch

Workspace

What needs me now?

The manager’s board. Exceptions first. Ready locations stay quiet.

Walk list4 locations

2 West

Needs attention

Kitchen

In progress

3 East

Ready

Today’s Work

Where should I walk next?

The supervisor walk: coverage, call-downs, and locations that need attention.

Next2 West

Opening temperature log

Due for lunch

Report an issue

This location

Unit Workspace

What do I do here?

A tablet at this location. PIN in. The next log, the next mark, the next issue — nothing else.

One product

Start with dietary. Add EVS and Plant Ops when you are ready.

The same board, licensed by the departments you run. Unlimited people at every role.

A servery pass before breakfast

Dietary

Meal periods, servery readiness, coverage, and the logs that happen during service.

An EVS cart in a quiet corridor

EVS

Zones, rounds, and what still needs a walk before the next service window.

A Plant Ops technician at an air handler

Plant Ops

Assets, repairs, and the issues that keep a location from being ready.

A supervisor checking a tablet in the dining room

How it works

Built for the people who run the meal.

Tablet and PIN

Staff sign in at the location. They do not hunt for a portal, and they do not carry the whole facility on one screen.

During the work, not after

Logs and meal marks happen on the floor, while the meal is happening. Documentation is a byproduct of doing the work.

Knowledge stays with the work

Procedures sit on the unit, the issue, and the asset — not in a separate binder someone has to go find.

Pricing

One product. Unlimited users.

You pay for the first department — not for seats, rooms, or logs.

First department

$299/month

Usually Dietary. Facility foundation included.

Additional departments are $149/month.

Sign in

Annual billing is 10% off. Self-setup is included. Assisted setup is optional, about $1,500 for the first department.

How is today going?

Answer it in fifteen seconds — without leaving the floor.